Shell & Tube Heat Exchangers
Thermal sizing in HTRI, mechanical checks in PV Elite, fabrication to TEMA and ASME VIII — up to bellows-type units with 400 mm tubesheets.
See specificationsPermits us to fabricate pressure vessels under the stricter rules of ASME Section VIII Division 2. This certificate covers the SIDCO Industrial Estate plant (Unit I) in Coimbatore.
Compared with Division 1, Division 2 relies on design-by-analysis and imposes tighter rules on materials, fabrication and examination. The result can be thinner, lighter shells for high-pressure duty, cutting both weight and cost on large equipment. Only a limited number of fabricators hold the U2 stamp, and purchasers frequently specify it for high-pressure hydrocarbon and gas applications.
Owners of oil refineries, gas processing facilities and power utilities around the world commonly write ASME code stamping and National Board registration into their purchase specifications. Because we hold these authorisations ourselves, you receive code-compliant equipment directly from the fabricator, together with the documentation your third-party inspectors will want to review.
| Issuing body | Granted by The American Society of Mechanical Engineers (ASME) |
|---|---|
| Standard / scope | Section VIII Division 2 of the ASME Boiler and Pressure Vessel Code |
| Held by | United Cooling Systems Pvt. Ltd. |
| Applies to | Unit I |
| Certificate number and validity | Printed on the certificate itself. We can send an up-to-date copy when asked. |
Certainly. ASME and National Board authorisations are listed in their public online directories, and each ISO certificate can be confirmed with the certification body printed on it. We will gladly supply the certificate numbers you need.
That is decided by the equipment's size, type and code requirements. Our quotation will state the building unit and the certificates that apply to your job.

Thermal sizing in HTRI, mechanical checks in PV Elite, fabrication to TEMA and ASME VIII — up to bellows-type units with 400 mm tubesheets.
See specifications
Fin fan coolers to API 661, finned on our own extruded and embedded lines and already delivered to ADNOC, PDO Oman and NNPC.
See specifications
Ready-to-install skid packages combining pressure vessels, filters, piping and structural steel.
See specificationsGive us the date your equipment must be on site. We will plan design, fabrication, inspection and shipping backwards from it and tell you honestly if it is achievable.